Pilot program now open — limited seats for mid-market GCs. Book a demo today.

Construction Intelligence Layer

Intelligence for
the way projects
actually work.

Procore tells you Procore is fine. QuickBooks tells you QuickBooks is fine. They're both right inside their silos. The margin erosion, unbilled change orders, missed waivers, and cash gaps happen between your systems, not inside them. Skopos Lens lives in that gap.

Skopos Lens integration diagram

BUILT FOR YOUR STACK

Procore
QuickBooks
Sage
Autodesk Construction Cloud
Buildertrend
CMiC
HCSS
Foundation Software
STACK
Smartsheet
Trimble
Procore
QuickBooks
Sage
Autodesk Construction Cloud
Buildertrend
CMiC
HCSS
Foundation Software
STACK
Smartsheet
Trimble

The problem your software vendors will not solve

Your stack is a set of accurate, isolated reports.

Each system is correct about its own slice. None of them know what the others know. That is where the dollars leak.

PROCORE

Project truth

Budgets, commitments, change events, RFIs.

QUICKBOOKS · SAGE

Financial truth

Cash, GL, AP, AR, payroll.

COMPLIANCE

Risk truth

Lien waivers, COIs, W-9s, licenses.

ESTIMATING

Bid truth

Scope, cost codes, productivity.

SCHEDULING

Timing truth

Milestones, delays, weather.

"Procore is right. QuickBooks is right. Both are right, and that is exactly why nobody can tell you why margin is down three points this quarter."

Verify your numbers before they reach the bank, the surety, or your CPA.

How It Works

One platform that compares your systems against each other.

Your project management system is right. Your accounting system is right. Neither one knows what the other recorded. Skopos Lens reads both, normalizes both, and runs a defined set of verification rules across the pair.

1

Connect

QuickBooks Online, Procore, and CSV live now. Sage and additional connectors in active development.

2

Normalize

Maps sources to a canonical data model across systems.

3

Verify

Runs 12 defined rules across the normalized pair. Every finding cites source records.

4

Act

Findings route to your team. Severity and confidence scored. Your team reviews. Your team decides.

Two Overlapping Data Layers

Procore SaysQuickBooks Says
Contract Value$2,400,000$2,100,000
Costs to Date$1,847,000$1,903,000
Retainage Held$187,500$142,000

Each system is correct. Neither knows what the other recorded.

What It Does Today · V1 Live

Twelve verification rules, running now.

Every rule cites source records. Every finding includes confidence and severity. Your team reviews. Your team decides.

R1

Overbilling detection

Flags billing that exceeds the recorded budget or contract baseline.

R2

Profit fade sentinel

Flags projected cost above original contract value while the job is still active.

R3

Change order drift

Detects change-order movement that can explain contract-value and margin drift.

R4

Budget burn trajectory

Surfaces cost burn patterns that are outrunning recorded budget progress.

R5

Vendor commitment vs AP

Compares committed vendor value against AP-side exposure.

R6

Pay app without receipt

Flags paid pay applications when receipt evidence is missing.

R7

Vendor missing tax ID

Compliance gap flagged before the first 1099 cycle.

R8

WIP over-billing variance

Detects revenue ahead of cost-to-cost work performed.

R9

WIP under-billing variance

Detects work performed ahead of billing. Cash trapped in WIP.

R10

Missing lien waiver

Lien exposure flagged before payment release.

R11

Retainage rate inconsistency

Flags pay applications whose effective retainage rate drifts from median.

R12

Sage AP vs Procore commitment

Flags when AP spend in Sage has exceeded the committed contract value in Procore.

Findings Register

167 findings. Every one back to source.

Filter by rule, severity, project, or minimum confidence. Click any row and the evidence trail opens with the source records that triggered the finding and the systems that disagreed.

Rule filter: All 12 rules
Severity threshold: Material only
Project scope: Active contracts
Confidence: 85% minimum
Findings Register — Summit Civil Constructors Demo

Reconciliation

The page your finance team will open every day.

Continuous cross-system reconciliation, sorted by largest recorded variance. Source-backed dollars on one side, recorded dollars on the other, and an explicit count of rows where the source values are missing. Skopos Lens does not fabricate source-side amounts. If a finding did not capture the original values, the row says so.

Reconciliation View — Summit Civil Constructors Demo

Vendor Compliance

24 vendors. $93.8M committed. 8 high risk.

The point isn't a vendor scorecard. The point is the scorecard cites which records made it light up.

Vendor Compliance — Summit Civil Constructors Demo

Skopos goes past flagging discrepancies. We give your finance team the surfaces they need before disclosure to a bank, a surety, or a CPA.

AIA BILLING

G702 / G703 generation.

Generate AIA-format pay applications directly from verified WIP data. Source-cited line items. No retyping.

BANK & SURETY

Disclosure-ready packages.

Compile WIP, contract value, billings-to-date, costs-to-date into a single disclosure document. Every number traces.

P&L

Project-level profit visibility.

Real margin per project. Real profit fade detection. Real variance from estimated to actual.

CHANGE ORDERS

Velocity and aging tracking.

Approved but unbilled change orders. Pending change orders by age. The CO backlog nobody else surfaces.

COST CODES

Reconcile codes across systems.

When Procore's cost code structure does not match QuickBooks job costing, Skopos surfaces the misalignment before it distorts forecasts.

MONTH-END CLOSE

Pre-close data readiness.

Know which projects are clean and which are not before the close cycle starts. No more discovering data gaps on day 5.

V1 rules surface the discrepancies. These surfaces turn them into deliverables.

By Role · What Each Seat Does Today

Every seat sees the data it can act on.

One permission-enforced dashboard, five role views. Same source of truth, different framing of it.

CEO / OWNER

Stop the surprises.

CFO

Stop finding out about margin erosion three months late.

CONTROLLER

Stop closing the books on numbers nobody has reconciled.

PROJECT MANAGER

See your project's financial exposure, not just the schedule.

IT / ADMIN

One read-only connection. No agents. No writes.

CFO Dashboard — Summit Civil Constructors Demo

Skopos Brain · Coming Soon

Your firm's memory, searchable.

Semantic search across verification findings, with source-cited evidence trails. Ask which projects have had margin fade in the last 12 months. Ask which vendors have the highest AP exposure. Vendor records, project notes, and broader source-record indexing. No invented numbers. No generic web results.

Skopos Brain Search

The Long Game

The longer it runs, the sharper it gets.

Every verification cycle builds context. Cost code patterns. Owner payment behavior. Estimator accuracy. Margin drift by project type. Skopos doesn't just flag today's problems — it builds a working model of how your firm actually operates.

Roadmap

Paced around pilot validation, not internal release cycles.

LIVE NOW

  • 12 verification rules
  • WIP report PDF generation
  • CFO dashboard
  • Findings register
  • Vendor compliance tracking
  • QuickBooks Online connector
  • Sage 300 CRE connector
  • CSV upload

BUILDING

  • Procore connector
  • AIA G702/G703 generation
  • Bank/surety disclosure package
  • Cost code reconciliation
  • Project-level P&L

ON THE LIST

  • Sage Intacct connector
  • Viewpoint Vista connector
  • Foundation connector
  • Buildertrend connector
  • CMiC connector
  • 13-week cash forecast
  • AI-assisted findings review
  • Owner payment behavior model
  • Email ingestion for compliance docs

Roadmap timing is directional. Pilot customers shape it.

Architectural Commitments

What Skopos will never do.

01

No GL writes

Skopos never writes to your General Ledger. Never. Your accounting team posts. Skopos surfaces.

02

No pay app approvals

Skopos never approves pay applications. Findings route to your team. Humans decide.

03

No money movement

Skopos never initiates payments. No banking integrations. No payment rails. By design.

04

No source modifications

Skopos never modifies your source systems. Read-only access to Procore, QuickBooks, Sage. Your data stays your data.

05

No team replacement

Skopos does not replace your team. It removes the spreadsheet duct tape from between them.

06

No invented numbers

Every finding cites the source records that triggered it. If the data is not there, Skopos says so.

Skopos exposes the truth. Your team keeps control.

Frequently asked questions

No. Skopos Lens is read-only by architectural principle. We never write to Procore, QuickBooks, Sage, or any connected system. Your data stays in your systems.

Most pilot customers are connected and seeing findings within a week. QuickBooks Online and CSV upload are live now. Procore is in active development.

Procore is not required. QuickBooks Online and CSV upload are live today. Tell us your stack when you request a pilot and we will confirm what we can connect.

Controllers and CFOs at mid-market US general contractors — firms running $10M to $250M in annual revenue across multiple active projects.

Skopos reads source data over authenticated, read-only API connections. We never store credentials. Data is tenant-isolated at the database level with row-level security enforced on every query.

No. Skopos removes the manual reconciliation work between systems. Your team still posts, approves, and decides. We surface what needs their attention.

We will reach out within one business day. We will tell you, in writing, exactly what Skopos can verify in your specific environment before you connect anything.

Your ERP knows what is inside your ERP. Skopos knows what is between your ERP and your project management system. That gap is where overbilling, profit fade, and compliance exposure live.

Request a Pilot

Stop running your construction company on numbers nobody has reconciled.

Pilot cohorts are intentionally small. Pacing is driven by validation depth, not deal count. Bring your stack. We will tell you, in writing, what Skopos can verify in your environment in week one.